Key takeaways
- ISO 9001:2026 splits risk-based thinking into three sub-clauses: determining risks and opportunities (6.1.1), actions on risks (6.1.2) and actions on opportunities (6.1.3).
- Actions on risks must be proportionate to the potential effect, and may cover risks to delivery during and after a disruption.
- Treatment options are now spelled out more clearly: avoid, take, remove the source, change likelihood or consequence, share, or retain by informed decision.
- Opportunities deserve their own register: new practices, products, partnerships and emerging technology are not just “positive risks”.
- Management review must look separately at the effectiveness of actions on risks and on opportunities.
1. The problem with combined registers
Since 2015 many organisations have kept one “risks and opportunities” register in which opportunities appear as an afterthought: one line saying “opportunity: improve customer satisfaction” next to twenty well-analysed risks. Auditors rarely found evidence that opportunities were evaluated, resourced or followed up.
The 2026 edition makes the distinction explicit. Risks and opportunities are still determined together from the context, interested parties and the scope, but actions on each are planned, integrated into processes and evaluated separately.
2. The new structure
| Sub-clause | Focus | Typical evidence |
|---|---|---|
| 6.1.1 Determining risks and opportunities | Using context (4.1), interested parties (4.2) and scope (4.3) to identify what could affect conformity and customer satisfaction | Workshop records, process-level risk identification, link to context review |
| 6.1.2 Actions to address risks | Proportionate actions, integrated into processes, with effectiveness evaluated | Risk register with treatment option, owner, process link, due date and effectiveness check |
| 6.1.3 Actions to address opportunities | Deciding which opportunities to pursue and how | Opportunity register with expected benefit, resources, decision and follow-up |
| 9.3.2 Management review inputs | Effectiveness of each type of action reviewed separately | Management review minutes with two distinct agenda items |
3. Treatment options for risks
The edition lists the familiar options from risk management practice. Using them explicitly in your register makes decisions transparent:
| Option | Example in a manufacturing company |
|---|---|
| Avoid the risk | Stop accepting orders for a product the line cannot produce reliably |
| Take the risk to pursue an opportunity | Accept a new demanding customer with a validation plan |
| Remove the source | Replace a single-source critical component |
| Change the likelihood | Add preventive maintenance to a bottleneck machine |
| Change the consequence | Hold safety stock for key customers |
| Share the risk | Contractual terms or insurance for transport damage |
| Retain by informed decision | Accept a minor risk with documented justification |
The key word is proportionate: a risk with minor impact does not need a project, while a risk that could stop deliveries to the main customer does.
4. Risks during and after disruption
The 2026 edition notes that risks to the delivery of products and services during and after a disruption may be included. This links ISO 9001 with business continuity thinking without requiring a full ISO 22301 system. Practical examples:
- Loss of a key supplier, utility or IT system.
- Extreme weather affecting logistics, linked to the climate change consideration in clause 4.1.
- Absence of key personnel with critical knowledge (7.1.6 organisational knowledge).
For each, the register should show the planned response and how quickly deliveries can resume.
5. Building a useful opportunity register
| Column | Purpose |
|---|---|
| Opportunity | Clear description: new market, technology, partnership, process change |
| Source | Context issue, customer feedback, audit, staff suggestion |
| Expected benefit | Quality, customer, cost or capacity benefit, quantified if possible |
| Resources needed | People, budget, time |
| Decision | Pursue / defer / reject, with date and decision maker |
| Integration | Which process or project carries it |
| Effectiveness | How and when the benefit will be measured |
A rejected opportunity with a documented reason is valid evidence; an opportunity listed for three years without a decision is not.
6. Integrating actions into processes
The standard asks that actions are integrated into the QMS processes. In practice:
- Each risk or opportunity is linked to a process owner and a process (e.g. purchasing, production planning).
- Controls appear in that process’s procedures, work instructions, KPIs or audit checklists.
- Internal audits test the controls in the process, not only in the register.
7. Common mistakes
- Generic risks copied from templates with no link to the organisation’s context.
- Scoring without criteria, so scores cannot be compared.
- No evaluation of effectiveness, only “action completed”.
- Opportunities written as risks with positive wording.
- Registers reviewed once a year just before the audit.
Conclusion
The separation in ISO 9001:2026 is more than a numbering change. It pushes organisations to manage risks with proportionate, effective controls and to treat opportunities as decisions that deserve resources and follow-up. Two focused registers reviewed at management review are a clear sign of a mature system.
Open your register today and count: how many opportunities have a decision, an owner and a measured result?
ISO 9001:2026 Transition Checklist
A two-page self-assessment covering context and climate, culture and ethics, risks and opportunities, planning of changes and audit readiness.