Enterprise Risk Assessment Tool
Assess risks with a 5×5 matrix, FMEA, Fine-Kinney, expected monetary value, and inherent versus residual risk against appetite.
Identify, analyse and rank your organisation’s risks with five widely used methods. Choose the method that fits the decision you need to make, build a risk register for each method, see the heat map and export the results. The tool follows the risk assessment process of ISO 31000 and the techniques described in IEC 31010.
Which method should you use?
| Method | Best for | Result |
|---|---|---|
| Risk matrix 5×5 | Enterprise risk registers, management review, ISO 9001 / 14001 / 45001 risks and opportunities | Score 1–25 and a heat map |
| FMEA (RPN) | Processes, products and equipment: how each step can fail, and how well you would detect it | RPN 1–1000 per failure mode |
| Fine-Kinney | Occupational health and safety hazards and tasks | Risk score R = P × E × C with five action levels |
| Quantitative (EMV) | Budgeting, insurance and investment decisions where money matters most | Expected monetary value per risk and in total |
| Inherent & residual | Showing what your controls achieve and whether each risk is within your risk appetite | Inherent and residual scores, appetite status, treatment |
1. Risk matrix (likelihood × impact)
The most common method in enterprise risk management. Each risk is rated for likelihood (1 rare to 5 almost certain) and impact (1 insignificant to 5 severe). The score is likelihood multiplied by impact, from 1 to 25. In the tool, 1–4 is low, 5–9 medium, 10–16 high and 20–25 critical, and the heat map shows how many risks sit in each cell. Define what each impact level means for your organisation (money, people, compliance, reputation) so that different people rate risks the same way.
2. FMEA: failure modes and effects analysis
FMEA looks at how each process step, component or function can fail. Each failure mode is rated from 1 to 10 for severity of its effect (S), likelihood of occurrence (O) and the chance that current controls detect it before it reaches the customer (D, where 10 means it cannot be detected). The Risk Priority Number is RPN = S × O × D, from 1 to 1000. Treat any severity of 9 or 10 as a priority whatever the RPN, because a high RPN can hide behind a low occurrence. The AIAG-VDA FMEA handbook (2019), used in the automotive sector, replaces the RPN with Action Priority tables; the RPN remains widely used elsewhere.
3. Fine-Kinney method
Developed by Fine (1971) and Kinney and Wiruth (1976), this method is widely used for occupational health and safety. The risk score is R = P × E × C: probability that the hazardous event happens (0.1 to 10), exposure, meaning how often people are exposed (0.5 rare to 10 continuous), and consequence (1 first aid to 100 catastrophe). Scores above 400 are very high and the activity should be stopped until the risk is reduced; 200–400 need immediate correction; 70–200 need correction; 20–70 need attention; 20 or less are acceptable. Exposure makes the method sensitive to how often a task is carried out, which a simple matrix does not show.
4. Quantitative assessment: expected monetary value
When decisions are about money, express each risk in currency. Enter the probability that the risk occurs within a year and three estimates of the financial impact: best case, most likely and worst case. The tool combines them with the PERT formula, (best + 4 × most likely + worst) ÷ 6, then multiplies by the probability to give the expected monetary value (EMV). Adding up the EMVs gives a reasoned figure for contingency budgets, insurance cover and the value of a new control: a control is worth paying for when it reduces the EMV by more than it costs.
5. Inherent and residual risk against risk appetite
Inherent risk is the level before your controls; residual risk is what remains after them. Rate likelihood and impact without controls, then choose how effective the existing controls are, from none (0%) to fully effective and tested (80%). The residual score is the inherent score reduced by that percentage. Set your risk appetite, the highest residual score the organisation is willing to accept, and the tool shows whether each risk is within appetite and suggests a treatment option from ISO 31000: accept, reduce, share or avoid. This simplified approach is useful for board reporting; a detailed assessment re-rates likelihood and impact after each control.
How the assessment fits ISO 31000
- Scope, context and criteria: decide what you are assessing and define your likelihood, impact and risk acceptance criteria.
- Risk identification: list risks that could help or prevent you from achieving your objectives, with their causes and consequences.
- Risk analysis: rate each risk with one of the methods above, considering existing controls.
- Risk evaluation: compare the results with your criteria and decide which risks need treatment and in what order.
- Risk treatment: choose and implement actions, assign owners and dates, and check the residual risk.
- Monitoring, review and reporting: keep the register current and report it to management.
Read our article on ISO 31000 enterprise risk management.
Frequently asked questions
Where is my data stored?
Only in your own browser on this device. Nothing is sent to ITA. Export the register to CSV to keep it or share it, and use Print for a paper copy.
Can I use several methods for the same risk?
Yes. Each method has its own register, so you can rate a hazard with Fine-Kinney for the safety team and with the 5×5 matrix for the enterprise register.
Are the level bands fixed?
No. They follow common practice. ISO 31000 asks each organisation to set its own risk criteria, so adjust the bands in your procedure if they differ.
Does the tool meet ISO 9001, ISO 14001 or ISO 45001?
It helps you analyse and record risks, which those standards require, but the standards also expect actions, integration into processes and evaluation of effectiveness. Our consultants can help you build a complete process.
Standards and references
The methods and terms in this tool are based on the following international standards, frameworks and original publications:
- ISO 31000:2018 Risk management — Guidelines (risk assessment process, clause 6.4; risk criteria, 6.3.4; treatment options, 6.5.2)
- IEC 31010:2019 Risk management — Risk assessment techniques (consequence/likelihood matrix, FMEA, quantitative techniques)
- ISO 31073:2022 Risk management — Vocabulary (replaces ISO Guide 73)
- ISO 45001:2018 Occupational health and safety management systems, clause 6.1.2 Hazard identification and assessment of risks
- ISO/IEC 27005:2022 Information security, cybersecurity and privacy protection — Guidance on managing information security risks
- IEC 60812:2018 Failure modes and effects analysis (FMEA and FMECA)
- AIAG & VDA FMEA Handbook, 1st edition (2019): Action Priority tables
- COSO Enterprise Risk Management — Integrating with Strategy and Performance (2017): risk appetite, severity and inherent/residual risk
- OCEG GRC Capability Model (Red Book) 3.5: principled performance, risk assessment and the integration of governance, risk and compliance
- PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide): expected monetary value and three-point (PERT) estimating
- Fine, W. T. (1971). Mathematical evaluations for controlling hazards. Journal of Safety Research, 3(4), 157–166
- Kinney, G. F., & Wiruth, A. D. (1976). Practical risk analysis for safety management (NWC TP 5865). Naval Weapons Center, China Lake
Need a complete risk management framework? See our consultancy services or contact us.
The tool supports your own assessment and does not replace professional judgement. ITA is not affiliated with ISO, IEC, COSO, OCEG, AIAG, VDA or PMI.
